Optimization and reconstruction of the cooling tower
30/05/2021
Karoon Cement Factory - Optimization
Consultation, Maintenance and Repairmen of the dust collecting systems.
25/11/2020
Karoon Cement Factory - Maintenance
Turnkey project undergoing major repairs and optimization of furnace, preheater and all dust collection systems of Kalate Cement Factory located 100 km from Ashgabat (capital of Turkmenistan)
2014
Kelete Cement Factory - Installation
Production line’s expansion joints adjustment and overhaul
12/06/2021
Karoon Cement Factory - Production
Complete design of the carbon hall’s dust collecting system
11/16/2019
PASCO (Pasargad Steel Company)
All stages of construction of silicon metal furnace and related bag house with a capacity of 350,000 cubic meters including engineering design, supply of goods, manufacturing of parts and installation of all equipment have been done from a to z.
11/09/2018
Borujerd Silicon Metal Production Furnace
Design,engineering,equipment procurement and constructing necessary parts in order to optimize loader and furnace’s metal tank dust collecting system
10/29/2020
Soofian Cement Factory - Construction
Optimization of bag dust collecting systems and equipment and related fans
10/29/2020
Soofian Cement Factory - Optimization
Design , construction and installation of Air sweep equipment in Sarcheshmeh copper complex’s melting furnace
10/24/2020
Iran National Copper Industries Company - Construction
Guidance and consultaion services for dust collecting system’s filteration in palletizing, steelmaking, carbon regeneration and lime units
09/10/2020
PASCO (Pasargad Steel Company)
Consultation for instrumentation equipment and staff’s technical documents
06/13/2021
Shokoufa Sanat Pouya Company
Melting and dryer furnaces overhaul in Khatoon-abad copper factory
06/03/2019
Iran National Copper Industries Company - Installtion
equipment procurement for line 4’s rollpress department’s dust collecting system
05/05/2020
Soofian Cement Factory - Maintenance
Audit and consulting services for all of unit 4’s bag filters
05/05/2020
Soofian Cement Factory - Installation
Installation of electrical facilities in ground and -1 floors, powerhouse and power substation for Tehan’s PLASCO project
04/03/2021
Tabiran Company
Equipment procurement for electrofilters
03/11/2019
Cany Mes Company - Optimization
Execution, correction and installation of converter flash electrofilters and ducts
03/11/2019
Cany Mes Company - Execution
Line 1 bypass electrofilter repairment in the factory site
02/19/2021
Shahrood Cement Factory
Preheater cooling tower deletion and cooking unit de-dust system upgrade
02/14/2021
West Asia Cement Factory
Replacement of fans k22,K23
02/08/2021
Arta Ardabil Cement Company
Line 1 and 2 electrofilter and grit repairment
01/26/2021
Shahrood Cement Factory
Modeling and drawing of the rolling system project
01/20/2021
PASCO (Pasargad Steel Company)
Raw materials and furnace’s electrofilter repairment
01/10/2021
Khamse Cement Factory